Exhibition of Studio Projects

Parallel path in ZOO

Matěj Střecha

Annotation

The aim of this project was to set up a parallel walking Safari trail and its incorporation so that the walk forms a separate comprehensive circuit while at the same time offering the visitors new, exciting experiences. The trail is connected to the existing trail in the western part of the walking Safari at the drill exposition. The trail crosses the concrete bed of the Netřeby river by means of a subtle steel bridge. After passing through the paddock and peeking into the Car Safari, the trail is crossed by a boat- or submarine-shaped walkway. The original concept of the Chinese Wall a walkway as a wall and also a safe place to observe rhinos in close proximity. The trail continues along the existing trail and ends at the entrance to the Zoo.

For the content of this site is responsible: Ing. arch. Josef Mádr