ZAN projects

Labyrinth Nachod

Adam Fiebinger

Annotation

The building is located in the town of Náchoda, near Masaryk Square and the pedestrian zone. From one part, it gradually sinks into the forest park, which covers the entire hill. The second part of the plot faces urban development. The front, specially modified iron structure helps to bring it closer to urbanism. The labyrinth itself is placed in a circle that is made of exposed concrete. It is situated in a circle to create a difference from the buildings we are used to in most cities. The dominant feature of the labyrinth is the skylights, which provide light and greenery. The building continues to be divided into 3 floors. In the first two, the labyrinth itself is located. In the third, an open space is offered, which isolates it from the surrounding streets of the city and provides an

For the content of this site is responsible: MgA. Kamila Amblerová